Adams Road Sidewalk Infill

The project consists of new sidewalk constructed between 16th and 22nd Ave in addition to the replacement of drywells within the project limits, all in accordance with the Contract Provisions and Plans.
  Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover & Index 1.1 MB
02 - Survey Control Plan 1.8 MB
03 - Demolition and TESC Plan 3.9 MB
04 - Demolition and TESC Plan 3.6 MB
05 - Demolition and TESC Plan Intersection Enlargements 2.9 MB
06 - Details 3.2 MB
07 - Sidewalk Plan 3.8 MB
08 - Sidewalk Plan and Profile 3.8 MB
09 - Driveway Plan and Profiles 2.1 MB
10 - Driveway Plan and Profiles 2.1 MB
11 - Curb Ramp Details 3.0 MB
12 - Stormwater Plan and Details 3.2 MB
13 - Traffic Control Detour Plan 2.2 MB
14 - Traffic Control Intersection Lane Closure 2.0 MB