Public Jobs

Bidding Closed
10/26/18 10:00 am
Argonne Road Preservation Project
City of Spokane Valley
Spokane Valley, Eastern WA
The project consists of sidewalk and curb construction; bituminous planning; HMA paving; storm improvements; signal work; signing; and other related work.
Bidding Closed
9/28/18 4:00 pm
RFP - Sale of Real Estate Property (8th and Carnahan)
City of Spokane Valley
Spokane Valley, Eastern WA
The City of Spokane Valley seeks prospective bidders to make proposals for the purchase and development of two City owned parcels located near the intersection of Carnahan Road and 8th Avenue.
Bidding Closed
7/13/18 10:00 am
Mission Avenue Street Preservation - McDonald to Evergreen
City of Spokane Valley
Spokane Valley, Eastern WA
The project consists of sidewalk and curb ramp work; storm drainage improvements; asphalt grinding; hot mix asphalt inlay; and other related work. Scope of work includes the following: Civil Construction , Stormwater, Asphalt, Curbs & Gutters, Sidewalks
Bidding Closed
7/13/18 10:00 am
Euclid Avenue Preservation Project
City of Spokane Valley
Spokane Valley, Eastern WA
This Contract provides for the improvements of Euclid Avnue from Sullivan Road to Flora Road. Work includes installation of ITS conduit; bituminous planning; Hot Mix Asphalt overlay paving and patching; channelization; and other related work,, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. Scope of work includes the following: Civil Construction , Asphalt, Concrete
Bidding Closed
7/20/18 4:00 pm
Engineering Design Services for the Barker/I-90 North Interchange Project
City of Spokane Valley
Spokane Valley, Eastern WA
The City of Spokane Valley (the “City”) is seeking a qualified engineering consultant to provide project development and final design services for the Barker/I-90 North Interchange Project through this Request for Qualifications (“RFQ”). The project will include working closely with City staff to perform preliminary design and prepare final design plans, specifications, and cost estimates for the preferred alternative. The Barker/I-90 North Interchange Project consists of designing new on and off ramp connections for westbound traffic at the Barker Rd and I-90 interchange, consisting of a single lane roundabout at the ramp terminal.